Erection steel structure for the Suez Steel factory – ALL building
• The total Qty. for that building is 24000 ton
• Fabrication, Erection of handrails 180 Ton
• Sand blasting &painting St. St. &handrail
• Erection cladding sheet 0.7 Thick. 170000 M
Equipment’s
• Survey of work
• Inspection reports
• Erection of all equipment’s
• Erecting & mechanical work
• Erection built convers
• Pipe Works
• Survey of work
• Inspection reports
• Erection of all PIPE
• Total Qty 14500 Ton